Comansa Jie tower crane at HK hotel site
Due to the requirements of the project, it was necessary to have a tower crane on the roof, but the height of the building and the narrow streets surrounding the hotel were quite an impediment to erect it. The crane's modular and lightweight sections and components ensured a quick and easy erection, and by its technical features (maximum load of 8 tonne), the crane was ideal for the work on the roof of the hotel.