Karnataka Plans New Road Grid System for Bengaluru

The Karnataka government plans to establish a new road grid system in Bengaluru to address shortcomings in the city’s urban planning, Chief Minister D.K. Shivakumar said on Tuesday. The initiative will also include measures to prevent unregulated construction around newly designated road corridors.

Shivakumar said the government was preparing a comprehensive map of areas affected by encroachments on stormwater drains. The mapped encroachments will be examined for removal as part of wider efforts to improve drainage and reduce the risk of urban flooding.

The Chief Minister made the announcements after laying the foundation stone for a stormwater drain strengthening project at Gunjur in the Mahadevapura Assembly constituency. The project, valued at Rs. 20 bn, includes flood-mitigation works and is being implemented with funding from the World Bank.

He said the government was working on a broader plan to improve Bengaluru’s infrastructure and provide permanent solutions to civic problems. As part of that effort, the administration is reviewing a notification issued by the previous BJP government towards the end of its term in 2023 for a 100-metre-wide road connecting Hosakote and Nandagudi.

The proposed road would have required the demolition of around 5,000 to 6,000 buildings. To reduce hardship for residents and limit the government’s compensation burden, the administration has decided to explore an alternative alignment and develop the road to a width of 45 metres wherever required.

Shivakumar said nearly Rs. 200 bn worth of infrastructure and road development works were under way in Bengaluru. The programme includes construction of new roads, strengthening of existing civic infrastructure and measures linked to flood management. The road grid is intended to guide future development while limiting construction that could obstruct planned transport corridors.