Puttur MLA Proposes Four-Lane Highway Between Mani and Puttur

Puttur MLA Ashok Kumar Rai has submitted a proposal to the National Highways Authority of India (NHAI) for a new four-lane highway connecting Mani and Puttur in Dakshina Kannada district, Karnataka. The proposed route is intended to address infrastructure constraints affecting heavy vehicle movement at the Mani junction on National Highway 75 (NH-75).

Under the suggested alignment, the road would branch off from Budoli, located slightly ahead of Mani, and reconnect with the existing highway near Kabaka. From Kabaka, the corridor would continue as a four-lane highway, providing large vehicles travelling towards Puttur with an alternative to the existing turn beneath the flyover at Mani.

The proposal follows concerns about the current road configuration after construction of a flyover on the Mangaluru-Bengaluru highway. The route towards Puttur passes below the overbridge and has a service-road layout, while the connecting road does not have infrastructure corresponding to national highway standards, according to the MLA. Large multi-axle trucks measuring about 40–50 ft in length face particular difficulty negotiating the turn from NH-75 towards Puttur.

Rai has said the constrained road geometry could create traffic-related problems as heavy vehicle movement increases. The proposed alignment is intended to avoid the restrictions at the existing junction and address longer-term traffic requirements, while the current Mani-Kabaka road would be retained and operated alongside the new corridor.

The MLA has indicated that the arrangement could help prevent traffic-related problems over the next 30 years. He also plans to discuss the proposal with Dakshina Kannada MP Capt Brijesh Chowta. However, the project remains at the proposal stage, with no announced construction cost, land acquisition details, implementation schedule or NHAI approval. Further action will depend on examination of the submission by the concerned authorities.