Search
Liebherr cranes working on final phase of Sagrada Família project
The Temple of the Sagrada Família will represent the future of modern Catalonia,” this is how the architect Antonio Gaudí described his masterpiece, which began construction in 1882 in Barcelona.
Liebherr cranes working on final phase of Sagrada Família project
The 710 HC-L 32-64 Litronic and 125 HC-L luffing jib cranes are ideal for this challenging project
Liebherr tower cranes renovate bridge in Spain
Two Liebherr 420 EC-H 16 Litronic cranes are secured to the bridge's pylons
Liebherr's last crane finishes work on Spin Tower in Frankfurt
Two 230 HC-L 8/16 and two EC-B cranes from Liebherr have been helping build the 128 m-high hotel and office tower
New NC-B 12-70 demonstrates its strength in Saudi Arabia
Just one look from above is enough to see the biggest challenge presented by the construction site in Medina: there’s not a lot of space.
New NC-B 12-70 demonstrates its strength in Saudi Arabia
With a 12-tonne lifting capacity and a 70-metre reach, the NC-B 12-70 is the most powerful tower crane in the NC-B series
Hüffermann sets up new rental fleet with tower cranes from Liebherr
Hüffermann Krandienst GmbH has purchased 70 Liebherr tower cranes in one go to set up its new rental fleet. A symbolic handover recently took place during a visit to Liebherr’s production facilities in Biberach..
25 Liebherr tower cranes at work at Hamburg’s HafenCity area
The first crane was assembled at the beginning of 2019. Today, there are more than 20 cranes in simultaneous operation. The planning and implementation of this major project has required patience and exceptional levels of collaboration between all parties involved.
S?o Paulo residential project using Liebherr tower cranes
Six 85 EC-B 5b Liebherr tower cranes are involved in building more than just a residential district in S?o Paulo, Brazil.