NHAI Review Begins for Mandi-Jaunapur Road amid Delhi Congestion

The Centre has begun examining a proposal to bring the Mandi-Jaunapur Road in south Delhi under the National Highways Authority of India (NHAI), a move that could lead to widening and redevelopment if the corridor meets prescribed criteria. The review follows repeated requests from South Delhi MP Ramvir Singh Bidhuri, who has identified the stretch as a major traffic bottleneck affecting links between Delhi, Haryana and the wider National Capital Region.

Union road transport and highways minister Nitin Gadkari informed Bidhuri about the development in a letter. Gadkari said officials had been directed to examine the proposal because of the need for highway infrastructure development in the South Delhi parliamentary constituency. He also clarified that roads must meet prescribed criteria before they can be brought under NHAI jurisdiction.

The proposal does not represent a formal transfer of the road to NHAI. It starts an evaluation process to assess the road’s suitability for inclusion in the Centre’s new highway development programme. The available information does not specify the criteria being applied, the agency responsible for the assessment or a timeline for a final decision.

Bidhuri had raised the issue in the Lok Sabha, describing the Mandi-Jaunapur Road as a critical missing link between two heavily used corridors. According to the MP, the Faridabad-Gurgaon Road and the Mehrauli-Gurgaon Road have already been taken over by NHAI, while the connecting stretch continues to experience severe congestion.

The road’s reported dimensions are central to concerns over its performance. Although it is designated as a 200-foot-wide master plan road, its actual width at several locations is around 30 feet, Bidhuri said. The difference between the planned width and the space available to traffic has been cited as a key reason for prolonged jams and disrupted movement on adjoining routes. Any improvement will depend on the examination, a possible administrative transfer and subsequent decisions on land, funding, tendering and construction, none of which have been announced. The ministry’s assessment is the next official milestone before the Centre decides whether the road qualifies for inclusion under NHAI.