Search

Building Strong Foundation

The increasing number of construction projects is driving a surge in demand for piling, drilling, and deep foundation equipment.

Liebherr to showcase 30 exhibits from 7 categories at Conexpo 2023

Liebherr construction machines on the outdoor grounds at booth F9253, Liebherr components at booth S80821 in the South Hall

Building a strong foundation

As India’s infrastructure modernisation drive gathers steam, there is a concomitant rise in demand for foundation equipment across the spectrum.

Potain cranes conquer jobsite with footprint restrictions at downtown Phoenix development

An MD 485 top-slewing crane and an Igo T 85 A self-erecting crane were strategically positioned to reach the full Haverly Apartments jobsite.

Laying a strong foundation

The demand for foundation equipment in India has been growing at the rate of 25 to 30 per cent year on year basis.

Sany launches first “Made in India” piling rig

Sany launches first “Made in India” piling rig

Liebherr unveils three new machines in one new design

All the three new machine models gleam in a new design.

We will be introducing more models in near future

The market size of the foundation equipment is estimated to see a drop this year. However, from the second half of 2021 till next 3-4 years, it is likely to grow substantially.

Sany Piling Rig SR 285R

The SR285RC10 rotary drilling rig is suitable for hard soil and rock drilling, widely used in pile foundation of civil engineering, expressway, bridge, high-rise buildings etc.

On Strong Foundation

Foundation equipment segment is back on action with a lot of equipment busy at various project sites across the country. The trend is expected to continue for the next few years.

Drilling to depths

The new elevated bridge approach for Vietnamese bridge in Haiphong is relying on a Liebherr LB36-410 to complete piles drilling through waterlogged ground on schedule.

CONEXPO-CON/AGG 2017

The five-day international exhibition on construction industry held in Las Vegas during March 7-11, 2017 recorded around 128,000 attendees, including around 26,000 international attendees.

Creating a strong foundation

The UAE-based piling contractor Delta Foundations Co is using its first Liebherr rotary drilling rig on a four-month contract to install the piling for a four-star hotel at Dubai?s Culture Village development.

The Beginning of a Success Story

Bauer foundation piles support the glass dome of the Reichstag building in Berlin, Germany; the 828-m-tall Burj Khalifa in Dubai stands on Bauer foundation piles - Bauer has influenced specialist foundation engineering since the mid 20th Century.

Hydraulic Grab Kit

Enteco presents its new SP-HG Kit (Hydraulic Grab). The SP-HG Kit is a technological innovation by Enteco

Hydraulic Grab Kit

Enteco presents its new SP-HG Kit (Hydraulic Grab). The SP-HG Kit is a technological innovation by Enteco which allows clients to construct diaphragm walls with their own E6050, or any other Enteco drilling rig equipped with an SP Kit (Enteco soil displacement technology) without having to buy a new dedicated rig specifically for diaphragm walls.

Exceeding Expectations

According to a report released by ICEMA, the current market size of the construction equipment including backhoe loader, concrete mixers excavator is around $2.8 billion. Further, the Indian construction equipment industry

CE Industry Buoyant at EXCON 2015

CII and ICEMA jointly showcased the CE industry at EXCON 2015, the 8th International Construction Equipment and Construction Technology Trade Fair, from 25-29 November 2015, at the BIEC grounds in Bengaluru

HR 260 Drilling Rig

The HR 260 is a self-erecting 75-tonne drilling rig for drilling large diameters both by the conventional kelly bar drilling system and by execution of direct rotary drilling with casing tubes and even use a casing oscillator as an optional.

Piling Deep for Solid Growth

In a highly competitive market space hitherto rigged with challenge, the piling industry has responded positively by developing and launching advanced rigs. The piling technology with latest monitoring features could help increase productivity and reduce overall cost of a project.

Liebherr LRB 155 Breaking Ground in India

Liebherr piling and drilling rig LRB 155 is helping Menard Asia in India for a design and build ground improvement project from Hindalco's Muri aluminium plant in Jharkhand. Menard, a global design and build ground improvement company having presence across the globe has bagged under the umbrella of Menard Asia in India .

Low Headroom Rigs from MAIT

Breakthrough technologyMAIT has launched a new line of drilling rigs called Low Headroom Rigs (LHR). These rigs provide the high torque required for drilling big diameter bores with a short mast. The engines used on these rigs are confirming to the latest emission norms.

In search of a strong foundation

Absence of big ticket projects such as greenfield power and steel plant projects, crashed out rental rates and surplus of idling equipment, and the cash flow crisis - the overall scenario of the foundation equipment market from the micro point of view seems to be grim, even though from the macro point of view few metro projects seem to have given a bit of relief to the industry.